Rehabilitation of Skylight Roof and Water Fountain in Kobani School in Erbil.

UNHCR
Rehabilitation of Skylight Roof and Water Fountain in Kobani School in Erbil. Request for pre-qualification

Reference: HCR/IRQ/COE/2024/RFQ-026
Beneficiary countries or territories: Iraq
Published on: 10-Sep-2024
Deadline on: 16-Sep-2024 00:00 (GMT 3.00)

Description

Additional required works for Kobani School in Erbil

The work includes the following:

  • Construction of drinking water fountains for Boys and girls using concrete blocks and mortar, covered by Porcelain tile, with all plumbing works.
  • Supply and install a polygam sheet (4mm) Moshajer to replace the damaged one in the school skylights and fix the existing frame.

Important Note:

  • UNHCR engineers or a Third Party will inspect the material quality and workmanship. The work must be within engineering specifications/standards and time limits.
  • The contractor is responsible for preparing a detailed shop drawing before starting the constitution and building drawings after construction.
  • UNHCR will provide monitoring forms to the contractor responsible for filling these forms.
  • The daily works will be overseen by a UNHCR engineer, partners, or third-party onsite daily.
  • Daily and Weekly reports by the contractor will be prepared and submitted to the supervising engineers for endorsement.
  • Detailed description and specifications are determined in the attached BOQ.
  • The contractor must complete all works per the Drawings, Bill of Quantities, and Technical Specifications within 45 days of signing the contract agreement or site hand over.
  • The contractor will be responsible for safely removing and disposing of used or leftover material from the site to the location identified by the UNHCR Engineer.