Supply and delivery of 45KVA Diesel Generators for Ethiopian Ministry of Finance
UNOPS
Supply and delivery of 45KVA Diesel Generators for Ethiopian Ministry of Finance
Invitation to bid
Reference:
ITB/2023/45946
Beneficiary countries:
Ethiopia
Registration level:
Basic
Published on:
13-Mar-2023
Deadline on:
07-Apr-2023 09:00 0.00
Description
The United Nations Office for Project Services , Ethiopian Multi-country office (hereinafter referred to as UNOPS ETMCO) is pleased to invite competent Bidders to submit their respective competitive Bids for the Supply and Delivery of 45KVA Diesel Generators for Ethiopian Ministry of Finance, Addis Ababa, Addis Ababa, Ethiopia in accordance with the UNOPS General Conditions of Contract and “Schedule of Requirements” herein uploaded under file ITB_Section_II_Schedule of Requirements.
- Supply and Delivery of Diesel Generators
This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido publicada usando el sistema eSourcing de UNOPS. Vendor Guide / Guide pour Fournisseurs / Guíra para Proveedores: https://esourcing.unops.org/#/Help/Guides
First name:
N/A
Surname:
N/A
Link | Description | |
---|---|---|
https://esourcing.unops.org/#/Help/Guides | UNOPS eSourcing – Vendor guide and other system resources / Guide pour fournisseurs et autres ressources sur le système / Guía para proveedores y otros recursos sobre el sistema |
26111601
-
Diesel generators
New clarification added: Dear Bidders,We received clarification requests from interested bidders. Please refer to the query and our responses below. Query1.1 We noted that the required Generator should euqipped with a built-in ATS which aready has the function of a circuit breaker. There is no need to add another MCCB, please clarify!1.2 The Electronic speed governor Generators are Euro II emission standards, but you required Euro III, please kindly clarify whether Euro II is acceptable!2. I have not agent in Ethiopia I am in Djibouti and Does the contract include installation and maintenance? Can I apply from outside Ethiopia?if you can send us Can you send more details about the brands, or are you content with a two-year warranty?3. Could you please confirm if quotations in EURO are accepted?4. Please note that our engines are not Euro 3 compliant. Would you consider this as just divergance from the specs but we can still sumbit our bid or this will automatically disqualify us.Regarding Incoterms, we can supply according to FCA only and Not DAP. Would you consider this as just divergance from the requirements but we can still sumbit our bid or this will automatically disqualify us.5. We would like to know if the FCA delivery period of 10 weeks is still in force or can be extended.The doubt arises from the following: After the last change in the requirements (euro 3 emission), there is no manufacturer of engines for generator sets in the world that meets the requirements within that period.Our Responses1.1 The built in ATS must be incorporated with the Generator output breaker. The ATS acts as a transfer mechanism only hence the MCCB is required1.2 Emission standard amended to Euro Stage 22. Installation and maintenance services are not included in the requirement yet as specified in Section II - Schedule of Requirements, a local agent is required. No nationality is excluded from this ITB and this is not a brand specific requirement.3. As stated under the Particulars section, this ITB's currency is USD. If you decide to submit with another currency, please refer to section 6 of Instruction to Bidders (available under the Documents tab) in order to understand how this is going to be managed.4. Emission standard amended to Euro Stage 2 and as per the bid requirement bidders are required to quote both in FCA and DAP.5. Emission standard amended to Euro Stage 2.Best Regards,
Edited on:
29-Mar-2023 17:32
Edited by:
webservice@unops.org
New clarification added: Dear Bidders,We received clarification requests from interested bidders. Please refer to the query and our responses below. Query1.1 We noted that the required Generator should euqipped with a built-in ATS which aready has the function of a circuit breaker. There is no need to add another MCCB, please clarify!1.2 The Electronic speed governor Generators are Euro II emission standards, but you required Euro III, please kindly clarify whether Euro II is acceptable!2. I have not agent in Ethiopia I am in Djibouti and Does the contract include installation and maintenance? Can I apply from outside Ethiopia?if you can send us Can you send more details about the brands, or are you content with a two-year warranty?3. Could you please confirm if quotations in EURO are accepted?4. Please note that our engines are not Euro 3 compliant. Would you consider this as just divergance from the specs but we can still sumbit our bid or this will automatically disqualify us.Regarding Incoterms, we can supply according to FCA only and Not DAP. Would you consider this as just divergance from the requirements but we can still sumbit our bid or this will automatically disqualify us.5. We would like to know if the FCA delivery period of 10 weeks is still in force or can be extended.The doubt arises from the following: After the last change in the requirements (euro 3 emission), there is no manufacturer of engines for generator sets in the world that meets the requirements within that period.Our Responses1.1 The built in ATS must be incorporated with the Generator output breaker. The ATS acts as a transfer mechanism only hence the MCCB is required1.2 Emission standard amended to Euro Stage 22. Installation and maintenance services are not included in the requirement yet as specified in Section II - Schedule of Requirements, a local agent is required. No nationality is excluded from this ITB and this is not a brand specific requirement.3. As stated under the Particulars section, this ITB's currency is USD. If you decide to submit with another currency, please refer to section 6 of Instruction to Bidders (available under the Documents tab) in order to understand how this is going to be managed.4. Emission standard amended to Euro Stage 2 and as per the bid requirement bidders are required to quote both in FCA and DAP.5. Emission standard amended to Euro Stage 2.Best Regards,
Edited on:
29-Mar-2023 17:28
Edited by:
webservice@unops.org
New amendment added #3: Dear Bidders, Please note that there is an amendment on this ITB as mentioned below:Emission standard amended from Euro Stage 3 to Euro Stage 2 (this change is highlighted in blue under Schedule of Requirements and Form D of Returnable Bidding Documents)Best Regards,
Edited on:
29-Mar-2023 16:55
Edited by:
webservice@unops.org
New amendment added #2: Dear Bidders, Please note that there are amendments on this ITB as mentioned below:Emission standard - Euro 3. Schedule of Requirement amended accordingly and change is highlighted in Purple DRiVE form is removed from the checklist - Please make sure you complete the DRiVE questionnaire under ‘Forms’ section of the ITBDRiVE Questionnaire included in the ‘Documents’ section for reference purpose. Please note that this version of the DRiVE form is ONLY for reference purpose and it is MANDATORY to insert all of the answers online (under the Forms section of the eSourcing).Form C of Returnable bidding forms amended to indicate the correct power cable size - change is highlighted in purple. Deadline for bid submission extended until April 7, 2023Deadline for clarifications extended until March 29, 2023Best Regards,
Edited on:
27-Mar-2023 17:46
Edited by:
webservice@unops.org
New amendment added #2: Dear Bidders, Please note that there are amendments on this ITB as mentioned below:Emission standard - Euro 3. Schedule of Requirement amended accordingly and change is highlighted in Purple DRiVE form is removed from the checklist - Please make sure you complete the DRiVE questionnaire under ‘Forms’ section of the ITBDRiVE Questionnaire included in the ‘Documents’ section for reference purpose. Please note that this version of the DRiVE form is ONLY for reference purpose and it is MANDATORY to insert all of the answers online (under the Forms section of the eSourcing).Form C of Returnable bidding forms amended to indicate the correct power cable size - change is highlighted in purple. Deadline for bid submission extended until April 7, 2023Deadline for clarifications extended until March 29, 2023Best Regards,
Edited on:
27-Mar-2023 17:43
Edited by:
webservice@unops.org
New clarification added: Dear Bidders,We received clarification requests from interested bidders. Please refer to the query and our responses below:Query1.1. With reference to Form C Price Schedule Form, more specifically "Bidder's delivery data", "FCA point(s) of delivery of the offered products": please advise if FCA Contractor's/Manufacturer's facilities, Italy is an acceptable delivery term. Otherwise, please indicate exact FCA location required.1.2. DRIVE Supplier Sustainability Questionnaire. Please provide us with an editable form of the questionnaire (word or excel), so that it can be duly filled in by our relevant company department (that has no direct access on esourcing.unops.org portal); 2. For calculating DAP cost, could you please clarify who the Consignee will be. Is it UNOPS or Ethiopian Ministry of Finance?3. I am submitting a tender related to ITB/2023/45946 and under Documents Checklist section the system requires that I upload the “DRIVE Supplier Sustainability Questionnaire”. Though I completed this questionnaire online, I am not able to download it from the Forms section of the e-sourcing system. There is no button that allows this download. Kindly advise.4.1 For the engin of the Diesel Generators ,We have imported, joint venture, and domestic engin,any special requirements...?4.2. What is the emission standard for the engine?4.3. What is the Operating environment and purpose of the engine?5. Can you confirm if the generator is for continous operation or intermitent operation and whether auto start would be required in the event of mains failure6.1 In the RFP, the cable length required for DG set is not specified. Please specify the length of cable required per DG set6.2 Please specify the scope for work post delivery if any.6.3. Since the DG sets are with ATS 2 runs of cable would be required for each DG set. Please clarifyOur Response1.1. Please note that each bidder is required to specify its named FCA point of delivery for offered products under Form C of Section III - Returnable Bidding Forms1.2 The DRiVE form will be shared for reference purposes and will be available to you shortly in the ‘Documents section of this ITB. Please note that this version of the DRiVE form is ONLY for reference purpose and it is MANDATORY to insert all of the answers online (under the Forms section of the eSourcing).2. The consignee is Ministry of Finance3. Please note that you are not required to upload the Questionnaire separately (same requirement will be amended under Checklist section of the eSourcing system, shortly)4.1 Technical specification and quality standard of Engine is as detailed in the schedule of requirements4.2 Emission standard requirement is Euro 3 - this will be included on the upcoming amendment4.3 Please refer to details specified under schedule of requirements for Environmental requirements and the Generator is intended for use at conflict affected areas of the country. 5. The purpose is to deploy the generators at conflict affected areas of the country and there might be a need to use them as a main power as applicable. As specified under schedule of requirement, the Generator is equipped with ATS which means an auto start is required on mains failure6.1 As specified in the schedule of requirements, the required cable length is 30 meter per each set6.2 All the requirements of this ITB are specified in the Section II - Schedule of Requirements 6.3. The required cable is 30 meters of 5x25mm2 direct burial type power cable per each setBest Regards,
Edited on:
27-Mar-2023 15:54
Edited by:
webservice@unops.org
New clarification added: Dear Bidders,Please find the below additional clarification requests and our response in this ITB.Question 1: About sound level, 75db 7m can acceptable? If the sound level <=68 7m, the cost will add more and also the freight. Or can we offer the two prices for 75db and 68db?Question 2: How many meters of 5x25mm2 direct burial type power cable need per set?Our ResponseAs stated under the Particulars section of this ITB, please note that Alternative offer is not accepted and the specification provided under Section II - Schedule of Requirements are minimum requirements.The requirement is for 30 meters of 5x25mm2 direct burial type power cable per each setBest Regards,
Edited on:
24-Mar-2023 11:53
Edited by:
webservice@unops.org
New clarification added: Dear Bidders,We received a clarification request from an interested bidder. Please refer the query and our response below.QueryWe are delighted to let you know that we will be participating in a tender named “Supply and delivery of 45KVA Diesel Generators for Ethiopian Ministry of Finance”. We kindly request your esteemed organization to give us clarifications at your earliest convenience for the below points; 1. In the RFP document, it says m.a.s.l is 2700m, and genset output prime has to be 36kw; standby 40kw. we regard this as after derating, prime 36kw. So can we quote generator, under m.a.s.l 1000m, prime 40kw, after derating under condition of masl 2700m, derating factor is about 0.9, so the real output under masl 2700m is 40kw*0.9=36kw. Please, if you have any doubt about this, confirm us as soon as possible.2. In RFP document, it says ambient temperature 50 0C, regard this is the requirement to radiator. If using 40 0C radiator is possible Please give us a confirmation on this.3. The concern about Sound level, our standard is 72db@7m when loading is 100% at silencer. Your technical requires 68db@7m, Please confirm us if you can accept 72db@7m.Our ResponseDear Bidder, Thanks for showing interest in our ITB. As stated under the Particulars section of this ITB, the Evaluation Method is, Lowest Priced Substantially Compliant offer. Hence, please note that bidders’ submissions are expected to be substantially compliant with all of the MINIMUM requirements as specified under Section II - Schedule of Requirement of the bid document.Best Regards,
Edited on:
24-Mar-2023 09:22
Edited by:
webservice@unops.org
New clarification added: Dear Bidders, We received the below clarification requests from interested bidders. Please find the Query and our response below:QueryFor the controller, would the end user require it to be controlled remotely through one computer? Please confirmWe are the authorized sole representative of the manufacturer of complete diesel generator set. And this manufacturer is the authorized OEM manufacturer of the engine and alternator brand. Is it acceptable that we submit the "Manufacturer's Authorization Form" issued by the OEM manufacturer together with their Authorization Letter from the engine and alternator brand? Our ResponseDear bidders please note that:As specified under the schedule of requirements document, the controller should incorporate a communication module. Hence, the controller should have an access to be connected to a network for remote monitoring and access. Any communication module to a network shall be delivered integrated. The requirement is for an official manufacturer’s authorization letter as per Form F of Returnable Bidding Forms. Hence, you can submit the authorization letter from the actual Manufacturer of the products. Best Regards,
Edited on:
23-Mar-2023 12:21
Edited by:
webservice@unops.org
New amendment added #1: Dear Bidders, There are few amendments on the initial technical requirements as mentioned below and changes are highlighted in orange under the Section II - Schedule of Requirement and Form D of section III - Returnable Bidding Forms:1. Fuel tank capacity amended from minimum 230 liter to minimum 160 litter for the integrated fuel tank2. Cable size is amended from 30 meters of Euro standard 5x16mm2 to 30 meters of Euro standard 5x25mm2 direct burial type cable.3. Fuel consumption amended from Maximum 10.6L/ hour at 100% loading to Maximum 11.6L/hr @ 100% load or 9L/hr @ 75% load4. Requirements of Engine Governor, Engine Heating, Main Circuit Breaker, Controller, ATS and Enclosure requirements are further elaborated.Hence, please use the amended Section II - Schedule of Requirement and Section III - Returnable Bidding forms for your bid preparation and submission accordingly.Best Regards,
Edited on:
22-Mar-2023 16:01
Edited by:
webservice@unops.org
New amendment added #1: Dear Bidders, There are few amendments on the initial technical requirements as mentioned below and changes are highlighted in orange under the Section II - Schedule of Requirement and Form D of section III - Returnable Bidding Forms:1. Fuel tank capacity amended from minimum 230 liter to minimum 160 litter for the integrated fuel tank2. Cable size is amended from 30 meters of Euro standard 5x16mm2 to 30 meters of Euro standard 5x25mm2 direct burial type cable.3. Fuel consumption amended from Maximum 10.6L/ hour at 100% loading to Maximum 11.6L/hr @ 100% load or 9L/hr @ 75% load4. Requirements of Engine Governor, Engine Heating, Main Circuit Breaker, Controller, ATS and Enclosure requirements are further elaborated.Hence, please use the amended Section II - Schedule of Requirement and Section III - Returnable Bidding forms for your bid preparation and submission accordingly.Best Regards,
Edited on:
22-Mar-2023 15:57
Edited by:
webservice@unops.org
New clarification added: Dear Bidders,We received clarification requests from interested bidders. Please refer the questions and our responses belowClarification Questions1. Can you please confirm if the fuel tank capacity of 230 litres (minimum) is for an integrated fuel tank solely or can the capacity of the integrated fuel tank be increased to the required specification with the incorporation of an external tank. 2. Please clarify the following questions: 2.1. We want to know where will be the delivery place if trade term is FAC?2.2. As the payment is 80%+20%,we would like to know how long your partner's inspection time will be? Is your partner a third party inspection agency or end-user?2.3. Subject to sufficient lead time, can we request you to appoint a third party inspection agency to inspect the factory before packing and loading as final inspection results?3.1.Please kindly clarify whether the Engine heating function is a Mandatory requirement,since It seem that it is not necessary for the perennial climate in Ethiopia.3.2. The required cable 30 meters of Euro standard 5*16mm2 power cable. Generally, the cable specification for this generator is 3*35+1*16mm2, kindly confirm if we must quote based on 5*16mm2 power cable.4. Regarding the 45KVA Diesel Generators with Canopy and ATS, we have the following questions need you kind to clarify:4.1. With regard to generator sets, do you have any specific requirements for diesel engine brand? because the price difference is very large among different diesel engine brands. 4.2. What is the purpose of the generator set, Is it main or standby?5. We have been advised to speak with the contact person for this tender request.Please could you call or share with us the best contact number.6. Obvien la anterior aclaración, ya está todo en orden. Estamos terminando de aportar toda la documentación necesaria. Disculpen las molestias.7. Can you confirm the application of the generator. In particular why a motorized breaker is required. Would a manual breaker be acceptable if the ATS is connected onto the Genset; the ATS is for automatic operation, so the breaker will be kept on always.8. We have the following Queries pertaining to the requirements of the technical specification. 8.1. Engine coolant Heating Included- This is generally required if the temperature goes below 10 degrees C. Please confirm whether Ethiopia has a below 10 degrees C temperature. If not then please exclude this requirement. 8.2. Prime Power Rating (PMP)-45KVA(36kw) Is this required at 2700 m.a.s.l. Altitude? If yes then You need a Next Rating of Generator to achieve a 45kva full load at 2700 m.a.s.l Altitude. Please clarify the PMP Rating requirement & Altitude.8.3. Enclosure Canopy- Enclosure and Terminal Box to be rated of a minimum of protection Class IP 23. Any IP Protection is not applicable for Acoustic Enclosure. Please correct this your requirement. 8.4. Ambient Temperature 0 to 50C. Please confirm 50 Degree Ambient Temperature Requirement.8.5.Altitude- 2700 m.a.s.l . Most Ethiopian Major Cities are located at an elevation of around 2000-2500m ( 6,600-8,200ft) above sea level. Please reconfirm the Altitude of the locations where these generators are going to be installed and operational.8.6. Warranty- Minimum 2 Years Warranty. Most International Brands-USA/JAPAN offers Only One Year or 2500 hours warranty whichever is earliest. Please confirm the same.9.1 Enquiry 1: Is the requested prime power rating of the Genset (45KVA) after derating at 2700m and 50 degrees centigrade relative to ISO and SAE reference conditions or at sea level without derating?9.2 Enquiry 2: If the answer to Enquiry 1 is after derating at the specified altitude and temperature, it is difficult to comply with the maximum fuel consumption set as 10.6 l/hr at 100% load of the prime power. We suggest revising the fuel consumption rating.10. Please be advised that we have a valid LTA of Provision Generators with UNOPS, where 60kva is included. As per the technical requirements in the tender, the actual power capacity after derate will be 46KVA. We would like to suggest that you can directly place order from the system contract.11. I would like to receive clarification on the question below:can you please send me the exact delivery location.12. May we kindly request if the Generators will be inported Duty Free or Duty Not.looking forward for your kind response13. For DAP term,pls adivse destination address.DAP working scope,shipper will be responsible for cargo deliver from origin to destination on truck. UNOPS responsible for import customs clearance and cargo unloading.Our Responses1. Please note that the requirement is for an integrated fuel tank only and the minimum capacity is amended to 160 litters.2.1 Please note that each bidder is required to specify its named FCA point of delivery for offered products under Form C of Section III - Returnable Bidding Forms2.2 Inspection will be done as soon as possible. Our partner (Ethiopian Ministry of Finance) is the end user and inspection will be done by technical experts or third party inspection agencies if deemed necessary.2.3 UNOPS may assign a third party inspection agency before shipment if deemed necessary3.1. Please note that Engine heating function is our partner’s specific mandatory requirement3.2 Cable size is amended to Euro standard 5x25mm2 direct burial type power cable.4.1 Please note that we do not have brand preference and with this regard, minimum technical and quality requirements are provided for the Engine required.4.2 The purpose is to deploy the generators at conflict affected areas of the country and there might be a need to use them as a main power as applicable.5. Please note that UNOPS do not give advice to directly contact personnels in ITBs. Please use this medium of communication for any clarification requests and we shall provide the necessary information accordingly. 6. Noted7. Please refer the amendment on Main Circuit Breaker8.1 The water jacket heather is a major requirement here in ethiopia. So please include the heather as specified in the document8.2 Yes we need 45Kva after derating. We've specified a generator with 45 KVA at 2700 Masl please follow the requirements 8.3 IP 23 is a protection from direct touch below over 12 cm and drops of liquid from 60 to 90 degrees of the equipment to be protected. This is a minimal protection for the generator canopy and terminal box. Whether this box is in a canopy or any indoor situation, the box must be covered and protected. IP 23 is crucial8.4 Confirmed8.5 As per the schedule of requirements8.6 The required warranty is for two years9.1 Yes, it is after derating9.2 Please note that the maximum fuel consumption requirement is amended from 10.6L/ hour at 100% loading to 11.6L/hr @ 100% load or 9L/hr @ 75% load10. Please note that our requirement is not for 60 KVA Generator11. As Mentioned in Form C of Section III - Returnable Bidding Forms, please note that the delivery location is at the Ministry of Finance warehouse - Addis Ababa, Ethiopia12. Our request is for you to submit net of any direct taxes. For the detail please refer the instruction regarding Duties and Taxes under the Particulares section of this ITB.13. As indicated in the Form C of Returnable Bidding Documents the requested INCOTERMS are: 1. FCA named place and 2. DAP - Ministry of Finance warehouse including customs clearance, delivery and offloadingNote: Amendement will follow shortly
Edited on:
22-Mar-2023 14:08
Edited by:
webservice@unops.org