New clarification added: Dear Sir,We have sent a clarification since 25-07-2020, but we did not recieve any response form you.Best regardsDear Bidder,Sorry for the late reply.Best regards,UNOPS ETOH Sudan Team
Edited on:
05-Aug-2020 12:52
Edited by:
webservice@unops.org
New clarification added: Dear Sir,We have sent a clarification since 25-07-2020, but we did not recieve any response form you.Best regardsDear Bidder,Sorry for the late reply.Best regards,UNOPS ETOH Sudan Team
Edited on:
05-Aug-2020 12:52
Edited by:
webservice@unops.org
New clarification added: Reference to RFP /TOR Data Sheet Clauses 14.1.2, 14.1.3 and 21.1 [for FTP]TOR: 4.0 Staffing/staffing time input for Construction Supervision ConsultancyStaffing schedule: There are some discrepancies about staff list (Key experts) in Data Sheets and under heading of 4.0 of TOR, the positions are different and required qualification of almost all the key experts are not mentioned in TOR.Please clarify. Dear Bidder,Thank you for your interest and for reaching out to us for clarification.Please stick to the key project personnel as described in Returnable Proposal Schedule 8.Additionally. The (recommended additional design team members are) at the end of the table in the retrunable proposal schedule 8 shall not be evaluated.Best regards,UNOPS ETOH Sudan Team
Edited on:
05-Aug-2020 12:47
Edited by:
webservice@unops.org
New clarification added: Reference to RFP /TOR Data Sheet Clauses 14.1.2, 14.1.3 and 21.1 [for FTP]TOR: 4.0 Staffing/staffing time input for Construction Supervision ConsultancyStaffing schedule: There are some discrepancies about staff list (Key experts) in Data Sheets and under heading of 4.0 of TOR, the positions are different and required qualification of almost all the key experts are not mentioned in TOR.Please clarify. Dear Bidder,Thank you for your interest and for reaching out to us for clarification.Please stick to the key project personnel as described in Returnable Proposal Schedule 8.Additionally. The (recommended additional design team members are) at the end of the table in the retrunable proposal schedule 8 shall not be evaluated.Best regards,UNOPS ETOH Sudan Team
Edited on:
05-Aug-2020 12:47
Edited by:
webservice@unops.org
New clarification added: Reference to RFP /TOR Data Sheet Clauses 14.1.2, 14.1.3 and 21.1 [for FTP]TOR: 4.0 Staffing/staffing time input for Construction Supervision ConsultancyStaffing schedule: There are some discrepancies about staff list (Key experts) in Data Sheets and under heading of 4.0 of TOR, the positions are different and required qualification of almost all the key experts are not mentioned in TOR.Please clarify. Dear Bidder,Thank you for your interest and for reaching out to us for clarification.Please stick to the key project personnel as described in Returnable Proposal Schedule 8.Additionally. The (recommended additional design team members are) at the end of the table in the retrunable proposal schedule 8 shall not be evaluated.Best regards,UNOPS ETOH Sudan Team
Edited on:
05-Aug-2020 12:46
Edited by:
webservice@unops.org
New clarification added: M/S: UNOPSSubject: Professional IndemnityRegarding to the above subject, let us take note of the following:- Is the bridges of considerations themselves are insured or not ?- The exact sum insured in relation to professional indemnity.RegardsDear Bidder,Sorry for the belated response.The old structures are not insured. Best regards,UNOPS ETOH Sudan Team
Edited on:
05-Aug-2020 12:36
Edited by:
webservice@unops.org
New clarification added: M/S: UNOPSSubject: Professional IndemnityRegarding to the above subject, let us take note of the following:- Is the bridges of considerations themselves are insured or not ?- The exact sum insured in relation to professional indemnity.RegardsDear Bidder,Sorry for the belated response.The old structures are not insured. Best regards,UNOPS ETOH Sudan Team
Edited on:
05-Aug-2020 12:36
Edited by:
webservice@unops.org
New amendment added #3: The closing date of this tender has been extended to 12 August 2020
Edited on:
21-Jul-2020 11:47
Edited by:
webservice@unops.org
New amendment added #3: The closing date of this tender has been extended to 12 August 2020
Edited on:
21-Jul-2020 11:46
Edited by:
webservice@unops.org
New amendment added #3: The closing date of this tender has been extended to 12 August 2020
Edited on:
21-Jul-2020 11:46
Edited by:
webservice@unops.org
New amendment added #2: Dear Bidder,The closing date of this tender has been extended to 5 August 2020
Edited on:
21-Jul-2020 10:37
Edited by:
webservice@unops.org
New clarification added: Dear Sir/MadamOn behalf of Eng,George Wagwa from Ama consulting Engineers.Nairobi.Kenya.It is unfortunate that as a Company we would not be able to bid for tender No RFP/2020/15174 on regards to Tender particulars Section on offeror eligibility,Our Company is not legally registered in Sudan and unable to find an associate from Sudan especially with the ongoing Pandemic.Thank you we appreciate your time and effortDear Bidder, Thank you for your interest in working with UNOPS ETOH Sudan Office. We are sorry that the terms in this tender could not be altered or waived. We wish you good luck in our future business opportunities.Best regards,
Edited on:
15-Jul-2020 13:17
Edited by:
webservice@unops.org
New clarification added: Dear Sir/MadamOn behalf of Eng,George Wagwa from Ama consulting Engineers.Nairobi.Kenya.It is unfortunate that as a Company we would not be able to bid for tender No RFP/2020/15174 on regards to Tender particulars Section on offeror eligibility,Our Company is not legally registered in Sudan and unable to find an associate from Sudan especially with the ongoing Pandemic.Thank you we appreciate your time and effortDear Bidder, Thank you for your interest in working with UNOPS ETOH Sudan Office. We are sorry that the terms in this tender could not be altered or waived. We wish you good luck in our future business opportunities.Best regards,
Edited on:
15-Jul-2020 13:16
Edited by:
webservice@unops.org
New clarification added: Dear Sir/MadamOn behalf of Eng,George Wagwa from Ama consulting Engineers.Nairobi.Kenya.It is unfortunate that as a Company we would not be able to bid for tender No RFP/2020/15174 on regards to Tender particulars Section on offeror eligibility,Our Company is not legally registered in Sudan and unable to find an associate from Sudan especially with the ongoing Pandemic.Thank you we appreciate your time and effortDear Bidder, Thank you for your interest in working with UNOPS ETOH Sudan Office. We are sorry that the terms in this tender could not be altered or waived. We wish you good luck in our future business opportunities.Best regards,
Edited on:
15-Jul-2020 13:15
Edited by:
webservice@unops.org
New clarification added: Hi, in the document "2 - RFP-2020-15174 _Section_II_Returnable Bidding Forms" pg-2, you stated that there are (6) causeways, and on pg-3 "The consultant has to conduct during this phase the geotechnical and the topographical survey". However, the scope of the geotechnical and topographical surveys is not defined, which will affect the methodology of the project. it seems you based the six causeways based on a preliminary geotechnical and topographical data, would you make that data available to the consultant? If not, will you define the scope of geotechnical and topographical requirement and study, taking under consideration the length of the road is over a hundred kilometer.ThanxDear Bidder,Thank you for the request for clarification you sent. Please see the response below:No topographical surveys were conduction and the locations were selected according to the locations of streams (Khor) that crosses the road. Thus the topographical survey required is related only to the specific selected location (as per the coordinates) and its surroundings to the limit that will enable the designer to produce a perfect design.
Edited on:
14-Jul-2020 15:23
Edited by:
webservice@unops.org
New clarification added: Hi, in the document "2 - RFP-2020-15174 _Section_II_Returnable Bidding Forms" pg-2, you stated that there are (6) causeways, and on pg-3 "The consultant has to conduct during this phase the geotechnical and the topographical survey". However, the scope of the geotechnical and topographical surveys is not defined, which will affect the methodology of the project. it seems you based the six causeways based on a preliminary geotechnical and topographical data, would you make that data available to the consultant? If not, will you define the scope of geotechnical and topographical requirement and study, taking under consideration the length of the road is over a hundred kilometer.ThanxDear Bidder,Thank you for the request for clarification you sent. Please see the response below:No topographical surveys were conduction and the locations were selected according to the locations of streams (Khor) that crosses the road. Thus the topographical survey required is related only to the specific selected location (as per the coordinates) and its surroundings to the limit that will enable the designer to produce a perfect design.
Edited on:
14-Jul-2020 15:23
Edited by:
webservice@unops.org
New clarification added: Hi, in the document "2 - RFP-2020-15174 _Section_II_Returnable Bidding Forms" pg-2, you stated that there are (6) causeways, and on pg-3 "The consultant has to conduct during this phase the geotechnical and the topographical survey". However, the scope of the geotechnical and topographical surveys is not defined, which will affect the methodology of the project. it seems you based the six causeways based on a preliminary geotechnical and topographical data, would you make that data available to the consultant? If not, will you define the scope of geotechnical and topographical requirement and study, taking under consideration the length of the road is over a hundred kilometer.ThanxDear Bidder,Thank you for the request for clarification you sent. Please see the response below:No topographical surveys were conduction and the locations were selected according to the locations of streams (Khor) that crosses the road. Thus the topographical survey required is related only to the specific selected location (as per the coordinates) and its surroundings to the limit that will enable the designer to produce a perfect design.
Edited on:
14-Jul-2020 15:22
Edited by:
webservice@unops.org
New clarification added: Dear Sir/Madam,We, as Denzay A&E, would like to request clarification on the following:1. As per the TOR, the design shall be submitted to UNOPS and through UNOPS to the local authority for review and approval. Does the design submittals need to be signed by a local engineer for the local authority's approval?2. Will there be site visits?3. Can the professional indemnity insurance cover be for 5 years?In addition, you are also requested to provide a map to show the locations of selected 6 causeways.Thanks in advance.Dear Bidder,Please see answers below to your request for clarification.1- No need for a signature of a local engineer at this stage, but the authorizing authority may ask their engineers to review and sign before giving their approval 2- No comprehensive geotechnical investigation is required, such as borehole drilling or extensive soil tests in the Laboratory. The foreseen types of structures are simple road drainage structures (causeway, box culvert, framed culvert, pipe culverts …), that excludes bridge structures. The soil investigation to be carried is intended to determine the bearing capacity of the soil in the structure location to justify the structural design and which could be carried out by simple tools and methods like test pits or hand augers and limited laboratory tests. The soil investigation is not required for the entire length of the road and it is only needed at the six proposed locations. 3- Site visit is not mandatory and UNOPS will not arrange for one, but it is recommended that the bidder may conduct his own site visit as he sees it appropriateCoordinates of proposed crossing pointsNoRoadCrossing NameCoordinatesNEDallami Locality1. Delling - HabilaKhor Zakaria11°58'19.79"29°56'22.99"2. Habila - KortalaKhor Arbaa11°59'30.55"30° 6'42.58"3. Habila - KortalaKhor Akhniss11°57'8.60"30° 1'52.97"4. Habila - KortalaKhor Galabiah12° 2'3.62"30°12'7.99"Abu Kershola Locality1. Sidra Abu KersholaKhor Garfi12°25'50.28"30°47'45.24"2. Sidra Abu KersholaKhor Kadada12° 8'6.66"30°47'7.12"
Edited on:
13-Jul-2020 15:56
Edited by:
webservice@unops.org
New clarification added: Dear Sir/Madam,We, as Denzay A&E, would like to request clarification on the following:1. As per the TOR, the design shall be submitted to UNOPS and through UNOPS to the local authority for review and approval. Does the design submittals need to be signed by a local engineer for the local authority's approval?2. Will there be site visits?3. Can the professional indemnity insurance cover be for 5 years?In addition, you are also requested to provide a map to show the locations of selected 6 causeways.Thanks in advance.Dear Bidder,Please see answers below to your request for clarification.1- No need for a signature of a local engineer at this stage, but the authorizing authority may ask their engineers to review and sign before giving their approval 2- No comprehensive geotechnical investigation is required, such as borehole drilling or extensive soil tests in the Laboratory. The foreseen types of structures are simple road drainage structures (causeway, box culvert, framed culvert, pipe culverts …), that excludes bridge structures. The soil investigation to be carried is intended to determine the bearing capacity of the soil in the structure location to justify the structural design and which could be carried out by simple tools and methods like test pits or hand augers and limited laboratory tests. The soil investigation is not required for the entire length of the road and it is only needed at the six proposed locations. 3- Site visit is not mandatory and UNOPS will not arrange for one, but it is recommended that the bidder may conduct his own site visit as he sees it appropriateCoordinates of proposed crossing pointsNoRoadCrossing NameCoordinatesNEDallami Locality1. Delling - HabilaKhor Zakaria11°58'19.79"29°56'22.99"2. Habila - KortalaKhor Arbaa11°59'30.55"30° 6'42.58"3. Habila - KortalaKhor Akhniss11°57'8.60"30° 1'52.97"4. Habila - KortalaKhor Galabiah12° 2'3.62"30°12'7.99"Abu Kershola Locality1. Sidra Abu KersholaKhor Garfi12°25'50.28"30°47'45.24"2. Sidra Abu KersholaKhor Kadada12° 8'6.66"30°47'7.12"
Edited on:
13-Jul-2020 15:55
Edited by:
webservice@unops.org
New clarification added: Dear Sir/Madam,We, as Denzay A&E, would like to request clarification on the following:1. As per the TOR, the design shall be submitted to UNOPS and through UNOPS to the local authority for review and approval. Does the design submittals need to be signed by a local engineer for the local authority's approval?2. Will there be site visits?3. Can the professional indemnity insurance cover be for 5 years?In addition, you are also requested to provide a map to show the locations of selected 6 causeways.Thanks in advance.Dear Bidder,Please see answers below to your request for clarification.1- No need for a signature of a local engineer at this stage, but the authorizing authority may ask their engineers to review and sign before giving their approval 2- No comprehensive geotechnical investigation is required, such as borehole drilling or extensive soil tests in the Laboratory. The foreseen types of structures are simple road drainage structures (causeway, box culvert, framed culvert, pipe culverts …), that excludes bridge structures. The soil investigation to be carried is intended to determine the bearing capacity of the soil in the structure location to justify the structural design and which could be carried out by simple tools and methods like test pits or hand augers and limited laboratory tests. The soil investigation is not required for the entire length of the road and it is only needed at the six proposed locations. 3- Site visit is not mandatory and UNOPS will not arrange for one, but it is recommended that the bidder may conduct his own site visit as he sees it appropriateCoordinates of proposed crossing pointsNoRoadCrossing NameCoordinatesNEDallami Locality1. Delling - HabilaKhor Zakaria11°58'19.79"29°56'22.99"2. Habila - KortalaKhor Arbaa11°59'30.55"30° 6'42.58"3. Habila - KortalaKhor Akhniss11°57'8.60"30° 1'52.97"4. Habila - KortalaKhor Galabiah12° 2'3.62"30°12'7.99"Abu Kershola Locality1. Sidra Abu KersholaKhor Garfi12°25'50.28"30°47'45.24"2. Sidra Abu KersholaKhor Kadada12° 8'6.66"30°47'7.12"
Edited on:
13-Jul-2020 15:55
Edited by:
webservice@unops.org
New clarification added: Dear Sir/Madam,We, as Denzay A&E, would like to request clarification on the following:1. As per the TOR, the design shall be submitted to UNOPS and through UNOPS to the local authority for review and approval. Does the design submittals need to be signed by a local engineer for the local authority's approval?2. Will there be site visits?3. Can the professional indemnity insurance cover be for 5 years?In addition, you are also requested to provide a map to show the locations of selected 6 causeways.Thanks in advance.Dear Bidder,Please see answers below to your request for clarification.1- No need for a signature of a local engineer at this stage, but the authorizing authority may ask their engineers to review and sign before giving their approval 2- No comprehensive geotechnical investigation is required, such as borehole drilling or extensive soil tests in the Laboratory. The foreseen types of structures are simple road drainage structures (causeway, box culvert, framed culvert, pipe culverts …), that excludes bridge structures. The soil investigation to be carried is intended to determine the bearing capacity of the soil in the structure location to justify the structural design and which could be carried out by simple tools and methods like test pits or hand augers and limited laboratory tests. The soil investigation is not required for the entire length of the road and it is only needed at the six proposed locations. 3- Site visit is not mandatory and UNOPS will not arrange for one, but it is recommended that the bidder may conduct his own site visit as he sees it appropriateCoordinates of proposed crossing pointsNoRoadCrossing NameCoordinatesNEDallami Locality1. Delling - HabilaKhor Zakaria11°58'19.79"29°56'22.99"2. Habila - KortalaKhor Arbaa11°59'30.55"30° 6'42.58"3. Habila - KortalaKhor Akhniss11°57'8.60"30° 1'52.97"4. Habila - KortalaKhor Galabiah12° 2'3.62"30°12'7.99"Abu Kershola Locality1. Sidra Abu KersholaKhor Garfi12°25'50.28"30°47'45.24"2. Sidra Abu KersholaKhor Kadada12° 8'6.66"30°47'7.12"
Edited on:
13-Jul-2020 15:51
Edited by:
webservice@unops.org
New clarification added: Dear Sir/Madam,We, as Denzay A&E, would like to request clarification on the following:1. As per the TOR, the design shall be submitted to UNOPS and through UNOPS to the local authority for review and approval. Does the design submittals need to be signed by a local engineer for the local authority's approval?2. Will there be site visits?3. Can the professional indemnity insurance cover be for 5 years?In addition, you are also requested to provide a map to show the locations of selected 6 causeways.Thanks in advance.Dear Bidder,Please see answers below to your request for clarification.1- No need for a signature of a local engineer at this stage, but the authorizing authority may ask their engineers to review and sign before giving their approval 2- No comprehensive geotechnical investigation is required, such as borehole drilling or extensive soil tests in the Laboratory. The foreseen types of structures are simple road drainage structures (causeway, box culvert, framed culvert, pipe culverts …), that excludes bridge structures. The soil investigation to be carried is intended to determine the bearing capacity of the soil in the structure location to justify the structural design and which could be carried out by simple tools and methods like test pits or hand augers and limited laboratory tests. The soil investigation is not required for the entire length of the road and it is only needed at the six proposed locations. 3- Site visit is not mandatory and UNOPS will not arrange for one, but it is recommended that the bidder may conduct his own site visit as he sees it appropriateCoordinates of proposed crossing pointsNoRoadCrossing NameCoordinatesNEDallami Locality1. Delling - HabilaKhor Zakaria11°58'19.79"29°56'22.99"2. Habila - KortalaKhor Arbaa11°59'30.55"30° 6'42.58"3. Habila - KortalaKhor Akhniss11°57'8.60"30° 1'52.97"4. Habila - KortalaKhor Galabiah12° 2'3.62"30°12'7.99"Abu Kershola Locality1. Sidra Abu KersholaKhor Garfi12°25'50.28"30°47'45.24"2. Sidra Abu KersholaKhor Kadada12° 8'6.66"30°47'7.12"
Edited on:
13-Jul-2020 15:50
Edited by:
webservice@unops.org
New clarification added: Dear Sir/Madam,We, as Denzay A&E, would like to request clarification on the following:1. As per the TOR, the design shall be submitted to UNOPS and through UNOPS to the local authority for review and approval. Does the design submittals need to be signed by a local engineer for the local authority's approval?2. Will there be site visits?3. Can the professional indemnity insurance cover be for 5 years?In addition, you are also requested to provide a map to show the locations of selected 6 causeways.Thanks in advance.Dear Bidder,Please see answers below to your request for clarification.1- No need for a signature of a local engineer at this stage, but the authorizing authority may ask their engineers to review and sign before giving their approval 2- No comprehensive geotechnical investigation is required, such as borehole drilling or extensive soil tests in the Laboratory. The foreseen types of structures are simple road drainage structures (causeway, box culvert, framed culvert, pipe culverts …), that excludes bridge structures. The soil investigation to be carried is intended to determine the bearing capacity of the soil in the structure location to justify the structural design and which could be carried out by simple tools and methods like test pits or hand augers and limited laboratory tests. The soil investigation is not required for the entire length of the road and it is only needed at the six proposed locations. 3- Site visit is not mandatory and UNOPS will not arrange for one, but it is recommended that the bidder may conduct his own site visit as he sees it appropriateCoordinates of proposed crossing pointsNoRoadCrossing NameCoordinatesNEDallami Locality1. Delling - HabilaKhor Zakaria11°58'19.79"29°56'22.99"2. Habila - KortalaKhor Arbaa11°59'30.55"30° 6'42.58"3. Habila - KortalaKhor Akhniss11°57'8.60"30° 1'52.97"4. Habila - KortalaKhor Galabiah12° 2'3.62"30°12'7.99"Abu Kershola Locality1. Sidra Abu KersholaKhor Garfi12°25'50.28"30°47'45.24"2. Sidra Abu KersholaKhor Kadada12° 8'6.66"30°47'7.12"
Edited on:
13-Jul-2020 15:49
Edited by:
webservice@unops.org
New clarification added: Dear Sir/Madam,We, as Denzay A&E, would like to request clarification on the following:1. As per the TOR, the design shall be submitted to UNOPS and through UNOPS to the local authority for review and approval. Does the design submittals need to be signed by a local engineer for the local authority's approval?2. Will there be site visits?3. Can the professional indemnity insurance cover be for 5 years?In addition, you are also requested to provide a map to show the locations of selected 6 causeways.Thanks in advance.Dear Bidder,Please see answers below to your request for clarification.1- No need for a signature of a local engineer at this stage, but the authorizing authority may ask their engineers to review and sign before giving their approval 2- No comprehensive geotechnical investigation is required, such as borehole drilling or extensive soil tests in the Laboratory. The foreseen types of structures are simple road drainage structures (causeway, box culvert, framed culvert, pipe culverts …), that excludes bridge structures. The soil investigation to be carried is intended to determine the bearing capacity of the soil in the structure location to justify the structural design and which could be carried out by simple tools and methods like test pits or hand augers and limited laboratory tests. The soil investigation is not required for the entire length of the road and it is only needed at the six proposed locations. 3- Site visit is not mandatory and UNOPS will not arrange for one, but it is recommended that the bidder may conduct his own site visit as he sees it appropriateCoordinates of proposed crossing pointsNoRoadCrossing NameCoordinatesNEDallami Locality1. Delling - HabilaKhor Zakaria11°58'19.79"29°56'22.99"2. Habila - KortalaKhor Arbaa11°59'30.55"30° 6'42.58"3. Habila - KortalaKhor Akhniss11°57'8.60"30° 1'52.97"4. Habila - KortalaKhor Galabiah12° 2'3.62"30°12'7.99"Abu Kershola Locality1. Sidra Abu KersholaKhor Garfi12°25'50.28"30°47'45.24"2. Sidra Abu KersholaKhor Kadada12° 8'6.66"30°47'7.12"
Edited on:
13-Jul-2020 15:48
Edited by:
webservice@unops.org
New clarification added: Dear Sir/Madam,We, as Denzay A&E, would like to request clarification on the following:1. As per the TOR, the design shall be submitted to UNOPS and through UNOPS to the local authority for review and approval. Does the design submittals need to be signed by a local engineer for the local authority's approval?2. Will there be site visits?3. Can the professional indemnity insurance cover be for 5 years?In addition, you are also requested to provide a map to show the locations of selected 6 causeways.Thanks in advance.Dear Bidder,Please see answers below to your request for clarification.1- No need for a signature of a local engineer at this stage, but the authorizing authority may ask their engineers to review and sign before giving their approval 2- No comprehensive geotechnical investigation is required, such as borehole drilling or extensive soil tests in the Laboratory. The foreseen types of structures are simple road drainage structures (causeway, box culvert, framed culvert, pipe culverts …), that excludes bridge structures. The soil investigation to be carried is intended to determine the bearing capacity of the soil in the structure location to justify the structural design and which could be carried out by simple tools and methods like test pits or hand augers and limited laboratory tests. The soil investigation is not required for the entire length of the road and it is only needed at the six proposed locations. 3- Site visit is not mandatory and UNOPS will not arrange for one, but it is recommended that the bidder may conduct his own site visit as he sees it appropriateCoordinates of proposed crossing pointsNoRoadCrossing NameCoordinatesNEDallami Locality1. Delling - HabilaKhor Zakaria11°58'19.79"29°56'22.99"2. Habila - KortalaKhor Arbaa11°59'30.55"30° 6'42.58"3. Habila - KortalaKhor Akhniss11°57'8.60"30° 1'52.97"4. Habila - KortalaKhor Galabiah12° 2'3.62"30°12'7.99"Abu Kershola Locality1. Sidra Abu KersholaKhor Garfi12°25'50.28"30°47'45.24"2. Sidra Abu KersholaKhor Kadada12° 8'6.66"30°47'7.12"
Edited on:
13-Jul-2020 15:48
Edited by:
webservice@unops.org
New clarification added: Dear sir,kindly, provide us with the location of the six structures that are mentioned in the scope of work earlier as a kmz file .Best RegardsDear Bidder,Thank you for reaching to us. Below are the coordinates of the six locaitons.Coordinates of proposed crossing pointsNoRoadCrossing NameCoordinatesNEDallami Locality1Delling - HabilaKhor Zakaria11°58'19.79"29°56'22.99"2Habila - KortalaKhor Arbaa11°59'30.55"30° 6'42.58"3Habila - KortalaKhor Akhniss11°57'8.60"30° 1'52.97"4Habila - KortalaKhor Galabiah12° 2'3.62"30°12'7.99"Abu Kershola Locality1Sidra Abu KersholaKhor Garfi12°25'50.28"30°47'45.24"2Sidra Abu KersholaKhor Kadada12° 8'6.66"30°47'7.12"
Edited on:
13-Jul-2020 08:57
Edited by:
webservice@unops.org
New clarification added: Dear sir,kindly, provide us with the location of the six structures that are mentioned in the scope of work earlier as a kmz file .Best RegardsDear Bidder,Thank you for reaching to us. Below are the coordinates of the six locaitons.Coordinates of proposed crossing pointsNoRoadCrossing NameCoordinatesNEDallami Locality1Delling - HabilaKhor Zakaria11°58'19.79"29°56'22.99"2Habila - KortalaKhor Arbaa11°59'30.55"30° 6'42.58"3Habila - KortalaKhor Akhniss11°57'8.60"30° 1'52.97"4Habila - KortalaKhor Galabiah12° 2'3.62"30°12'7.99"Abu Kershola Locality1Sidra Abu KersholaKhor Garfi12°25'50.28"30°47'45.24"2Sidra Abu KersholaKhor Kadada12° 8'6.66"30°47'7.12"
Edited on:
13-Jul-2020 08:56
Edited by:
webservice@unops.org
New clarification added: I have a request to make regarding Returnable Proposal Schedule 3 on partnership with local firms. At this time of COVID-19, it may be difficult to easily get a good local firm to associate with, particularly for firms coming from outside Sudan. Can this requirement be waived for purposes of submission but on award, association with local firms can be a condition before signing the Contract.Please consider this request and respond to enable us make a decision to bid or not.Thanks,Dear Bidder,Thank you for reaching out to us.The term in question in the particular section can not be amended or waived.Best regards,UNOPS ETOH Sudan Team.
Edited on:
06-Jul-2020 10:01
Edited by:
webservice@unops.org
New amendment added #1: Dear Bidders,The payment terms in the particulars' section of this RFP has been amended to read:Within 30 days after the submission of payment documentation as per below payment schedule:On preparation, completion and submission of the below reports to be reviewed and accepted by UNOPS:1- Delivery of Design in line with Design Complete 30%2- Delivery of Design in line with Design Complete 30%3- Delivery of Design in line with Design Complete 40%Local contractors, which are registered in Sudan, will be paid via bank transfer inside Sudan, in this case, Central Bank of Sudan policy will apply.
Edited on:
01-Jul-2020 13:36
Edited by:
webservice@unops.org