Rehabilitation & Completion Sewer network in Aden - Yemen
UNOPS
Rehabilitation & Completion Sewer network in Aden - Yemen
Request for quotation
Reference:
RFQ/2023/46440
Beneficiary countries or territories:
Yemen
Registration level:
Basic
Published on:
13-Apr-2023
Deadline on:
05-Jun-2023 09:00 0.00
Description
Rehabilitation & Completion Sewer network in Aden - Yemen
IMPORTANT INSTRUCTIONS TO PARTICPATE IN TENDER:
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
- LOT 1 - (IUS-AF-UWS-ADN-019) - Rehabilitation of the wastewater pumping station at Creatr with the provision of equipment, tools, and materials including energy efficient equipment with real-time process control, replacing the main pumping line - Aden, Yemen
- LOT 2 - - (EHC-AF-WS-ADN-005) Rehabilitation of wastewater Pump Stations and main trunk line (pump station and force main pipe from AlTawahi to Mualla Dis.- Aden, Yemen
- LOT 3 - (EHC-PR-WS-ADN-001) Rehabilitation of wastewater Pump Stations and main trunk line (Al-Malla'a pump station and force main pipe from Malla;a to Khor Makser Dis. - Aden, Yemen
IMPORTANT INSTRUCTIONS TO PARTICPATE IN TENDER:
- Bid Proposal Security with a total percentage of 2.5% of the supplier submitted proposal has to be issued in favor UNOPS Yemen.
- 2.5% Bid Security Proposal must be provided for each LOT in which the supplier wants to participate in.
- A copy of the bid proposal security has to be submitted in the eSourcing.
- The original bid proposal security has to be submitted to UNOPS office within 2 days after the submission deadline.
- Bid Proposal Security has to be submitted to UNOPS main office:
- Address: Haddah Street, Al-Rowishan Junction, Sana’a, Yemen
- Bid Proposal Security is accepted in the following forms:
- Certificated Bid Proposal Security by an authorized bank reference to format in the documents tab (Bid Proposal Security)
- Irrevocable cheques certified by a bank
- Bid Proposal Security is a pass and fail criteria, suppliers who fail to provide the bid bond will be eliminated from tender evaluation.
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido publicada usando el sistema eSourcing de UNOPS. Vendor Guide / Guide pour Fournisseurs / Guíra para Proveedores: https://esourcing.unops.org/#/Help/Guides
First name:
N/A
Surname:
N/A
Link | Description | |
---|---|---|
https://esourcing.unops.org/#/Help/Guides | UNOPS eSourcing – Vendor guide and other system resources / Guide pour fournisseurs et autres ressources sur le système / Guía para proveedores y otros recursos sobre el sistema |
70171705
-
Pipelines maintenance or management services
New clarification added: Dear Bidder, Please note the below-raised questions and our official responses in connection to the Request for QuotationQ1 . Even though confirmed by you, the missing piping drawing for Lot-3 ( for the first 2.4 KM) is still not uploaded in the system. Kindly provide. Ans 2 - Please check now the document has been uploaded This shall form part of the official solicitation documents. Please be guided accordingly
Edited on:
31-May-2023 10:52
Edited by:
webservice@unops.org
New amendment added #4: Admendment No. 4 - to Add the following : - Add the ESMP document to the tender. - Add the additional drawing for LOT 3 .
Edited on:
31-May-2023 10:31
Edited by:
webservice@unops.org
New clarification added: Dear Bidder, Please note the below-raised questions and our official responses in connection to the Request for QuotationQ1 What about customs clearance and taxes, are they added to the prices or are they net?Ans 1 - No custom clearance our taxes will be added , UNOPS will assist in obtaining the exemptions for the above in accordance to UNOPS logistics guidelinesThis shall form part of the official solicitation documents. Please be guided accordingly
Edited on:
31-May-2023 10:00
Edited by:
webservice@unops.org
New clarification added: Dear Bidder, Please note the below-raised questions and our official responses in connection to the Request for QuotationQ1 . Kindly note that no Piping Profile drawing is available for the first 2.4 km of Pipeline from Al Malla'a to Khormakser ( Lot-3) . The drawing available is only from Km 2+400 to 3+675 . Kindly provide. Ans 1- The document will be add and shared with you. Q2- which Ref No. shall we write for small works lot2 ? because there different references have Been written 2- our offer shall be along with adding the customs clearance or not ? 3- shall we write the plan and methodology for 4.3 along with our offer and write all details now or shall we only add it once we won the tender ?Ans 2- Please upload your documents reference to the below sequence :LOT 1 - (IUS-AF-UWS-ADN-019) - Rehabilitation of the wastewater pumping station at Creatr with the provision of equipment, tools, and materials including energy efficient equipment with real-time process control, replacing the main pumping line - Aden, YemenLOT 2 - - (EHC-AF-WS-ADN-005) Rehabilitation of wastewater Pump Stations and main trunk line (pump station and force main pipe from AlTawahi to Mualla Dis.- Aden, YemenLOT 3 - (EHC-PR-WS-ADN-001) Rehabilitation of wastewater Pump Stations and main trunk line (Al-Malla'a pump station and force main pipe from Malla;a to Khor Makser Dis. - Aden, Yemen This shall form part of the official solicitation documents. Please be guided accordingly
Edited on:
31-May-2023 09:38
Edited by:
webservice@unops.org
New clarification added: Dear Bidder, Please note the below-raised questions and our official responses in connection to the Request for QuotationThis shall form part of the official solicitation documents. Please be guided accordinglyQ1 Even after the clarification dated 29.5.2023, We are still not sure about the Lot-2 and Lot-3 naming.As per the RFQ and the submission Tab,LOT 2 - (EHC-PR-WS-ADN-001) Rehabilitation of wastewater Pump Stations and main trunk line (Al-Malla'a pump station and force main pipe from Malla;a to Khor Makser Dis. - Aden, YemenLOT 3 - (EHC-AF-WS-ADN-005) Rehabilitation of wastewater Pump Stations and main trunk line (pump station and force main pipe from AlTawahi to Mualla Dis.- Aden, YemenThe SUBMISSION TAB also says the same as above.However, the file “ LOT 2 - BoQ P-III-A_Amend” and all other drawings marked as " Lot-2" provides details for 450mm dia main trunk line from Al Tawahi to Mualla and rehabilitation of Al Tawhi Pump stationand the file “ LOT 3 - BoQ P-III-A_Amend” and all other drawings marked as " Lot-3" are for 630 mm dia main trunk line from Al Mualla to Khormaksar and rehabilitation of Al Mualla Pump station So , please confirm the following :The bidder should submit the BOQ “ LOT 2 - BoQ P-III-A_Amend” and all other supporting technical offer for 450mm dia main trunk line from Al Tawahi to Mualla and rehabilitation of Al Tawhi Pump station in the Submission Tab marked “ LOT 2 - (EHC-PR-WS-ADN-001) Rehabilitation of wastewater Pump Stations and main trunk line (Al-Malla'a pump station and force main pipe from Malla;a to Khor Makser Dis. - Aden, Yemen” - ALTHOUGH THE WORK AREA IN SUBMITTED FILES AND LOT NAME GIVEN IN SUBMISSION TAB DONT MATCH AndThe bidder should submit the BOQ “ LOT 3 - BoQ P-III-A_Amend” and all other supporting technical offers for 630 mm dia main trunk line from Al Mualla to Khormaksar and rehabilitation of Al Mualla Pump station in the Submission Tab marked “ LOT 3 - (EHC-AF-WS-ADN-005) Rehabilitation of wastewater Pump Stations and main trunk line (pump station and force main pipe from AlTawahi to Mualla Dis.- Aden, Yemen” -ALTHOUGH THE WORK AREA IN SUBMITTED FILES AND LOT NAME GIVEN IN SUBMISSION TAB DONT MATCH. we have opened the bid letter via the bank and it has been issued from the bank for 90 days and we have got the delay letter for opening the bid just today after issuing the bid from the bank. Will it be acceptable since it has been issued today؟Ans 1 - Please submit all documentation related to amended names as per the last update as follows: LOT 1 - (IUS-AF-UWS-ADN-019) - Rehabilitation of the wastewater pumping station at Creatr with the provision of equipment, tools, and materials including energy efficient equipment with real-time process control, replacing the main pumping line - Aden, YemenLOT 2 - - (EHC-AF-WS-ADN-005) Rehabilitation of wastewater Pump Stations and main trunk line (pump station and force main pipe from AlTawahi to Mualla Dis.- Aden, YemenLOT 3 - (EHC-PR-WS-ADN-001) Rehabilitation of wastewater Pump Stations and main trunk line (Al-Malla'a pump station and force main pipe from Malla;a to Khor Makser Dis. - Aden, Yemenyour document submission should be in above related order with same naming all documents related to each lots should follow the above structure so they are evaluated in the same pattern each labled to its lot including BoQ's. Q2 - In a previous inquiry, you mentioned that the ESMP is required to be signed and stamped and upload it to the protal, but it is not found in the bid documents. Please upload it to the documents or the bidder has to prepare an ESMP plan.Ans 2 - Will be added to the folder in as an amendement. Q3 - we have opened the bid letter via the bank and it has been issued from the bank for 90 days and we have got the delay letter for opening the bid just today after issuing the bid from the bank. Will it be acceptable since it has been issued today؟Ans 3 - Thank you please keep the same bid security and only submit it reference to bid security instruction the document will be accepted.
Edited on:
31-May-2023 09:18
Edited by:
webservice@unops.org
New amendment added #3: Admendment No. 3 - to Add the following : - Change the LOT lable in the general to tab to reflect the correct name for each lot. - Extend tendering time for an additional 7 as approved by project dupty Manger
Edited on:
29-May-2023 09:40
Edited by:
webservice@unops.org
New clarification added: Dear Bidder, Please note the below-raised questions and our official responses in connection to the Request for QuotationQ1 - Dear Bidder, Please note the below-raised questions and our official responses in connection to the Request for Quotation.Ans 1 - Please refer to the RFQ condition, scope of work , and BoQThis shall form part of the official solicitation documents. Please be guided accordingly
Edited on:
21-May-2023 08:12
Edited by:
webservice@unops.org
New clarification added: Dear Bidder, Please note the below-raised questions and our official responses in connection to the Request for QuotationQuestion-1 : As per the Description of LOT in the Portal (under “ Tender Information “ ) is given as :LOT 2 - (EHC-PR-WS-ADN-001) Rehabilitation of wastewater Pump Stations and main trunk line (Al-Malla'a pump station and force main pipe from Malla;a to Khor Makser Dis. - Aden, YemenLOT 3 - (EHC-AF-WS-ADN-005) Rehabilitation of wastewater Pump Stations and main trunk line (pump station and force main pipe from AlTawahi to Mualla Dis.- Aden, YemenThe vendor submission/document checklist in the portal also follows the above naming.However, in the tender documents, BOQ and drawings are Marked as “ LOT-2 – BoQ P-III-A “ , “LOT 2 - Drawing P-III-A-2” , “ LOT-2- Drawing P-III-A-1” etc. shows 450mm diameter pipeline from Al Tawahi PS to Al Ma’llaa and Al Tawahi PS.And BOQ and drawings are Marked as “ LOT-3 – BoQ P-III-B “ , “LOT 3 - Drawing P-III-B-2” , “ LOT-3- Drawing P-III-B-3” etc. shows 630 mm diameter pipeline from Al Ma’llaa to Khormaksar PS and the Pump station in Al Ma’alla. So, there is ambiguity and confusion as to which portion is named LOT-1 and which portion is named Lot-3. Please clarify and change the naming of either the tender documents (the BOQ and Drawings) or the Uploading Tags in the Portal so that the Lot number in the submitted documents and portal Tab under which it is submitted remains the same.Ans 1 - Please refer to the RFQ annexes and ruternbel forms . Question -2: In the Submission Tab ( vendor submission / Document check list) of the portal the following document have been requested to be uploaded: Document name: ESMPDocument Category: Others Document is: Mandatory. The bidder could not understand which document is meant by this. Kindly indicate where the Bidder can find this instruction. Ans 2 - Please sign and stamp the ESMP document and upload it to the protal, recognizing that doing so indicates your consent to the ESMP's requirements and cost associated.Q4 - The Bidder needs to obtain technical and financial offers from several vendors ( especially the specific technical questionnaire that each vendor needs to fill ) which is taking significant time. Some very important questions having impact on Technical and commercial submissions are also being replied. Due to this , the Bidder requests to extend the Bid submission date by at least 2 weeks ( i.e till 13th June 2023) . Kindly approve the extension request.Ans 4 - As of currently, no extensions will be given; however, if any extensions are granted, you will be notified via e-sourcing.This shall form part of the official solicitation documents. Please be guided accordingly
Edited on:
20-May-2023 23:24
Edited by:
webservice@unops.org
New clarification added: Dear Bidder, Please note the below-raised questions and our official responses in connection to the Request for QuotationThis shall form part of the official solicitation documents. Please be guided accordinglyClarification -8: Q1. Please confirm if it is mandatory to fill up the “Questionnaire “ and “ Supplier Form “ Tab under the vendor submission / Document section of the tender submission portal. If so , will the compliance to the answers carry any weightage for evaluation?Ans 1 - For all technical Questionnaire its is mandatory to fill , for the supplier '' Supplier Form" - it is recommanded to fill the Questionnaire and (Supplier Form Questionnaire) does not carry any weighing. Q2. In the “Document checklist “Tab under the vendor submission/document section of the tender submission portal, the contractor needs to submit the different schedules (Schedule 0.1 , 0.2, etc.) under the different upload links specifically mentioned. Using these links, we can upload all the “returnable schedules “except the following schedules:a. Schedule 0.10b. Schedule0.12c. Schedule 0.13d. Schedule 1.2However, the penultimate link in this document checklist section does not mention any specific schedule but requires the file “ small works – solicitation - RFQ section -6 – returnable schedule “ to be uploaded. Kindly confirm the following:A. Is it OK to upload only the schedules mentioned in (a) to (d) above under this penultimate link asking for a returnable schedule file ( as the other returnable schedules are uploaded already through different links )?B. In case (A) is not OK and the Contractor needs to submit all the filled-up returnable forms ( with attachments ) once again ( although most of them were submitted through other links) , the volume of the file will certainly be more than 20MB and the link will not allow it to be uploaded. What the Contractor should do then?Ans Q2 - Please uplaod the documents in accordance to checklist , noting the an additional checklist had been added to upload all returnable scheduals for each lot (Small Works - Solicitation - RFQ Section VI - Returnable Schedules (Bid submission form - Document is mandatory )), therefore please add and uplaod each schedual to checklist tab and also upload the full returable schedual documents to above mentioned tab.
Edited on:
20-May-2023 22:54
Edited by:
webservice@unops.org
New clarification added: Dear Bidder, Please note the below-raised questions and our official responses in connection to the Request for QuotationQ1 In the reply to clarification dated 15.5.2023, it has been informed that an amended BOQ will be issued. However, no such amended BOQ is found to be uploaded in the system. Please provide amended BOQs.Ans 1 - All BoQ's are uploaded to system with an updated version. Q2. In the BOQ, no summary sheet is available where the prices of Bill 1 to Bill -10 is added to arrive total Bid price. Please clarify if the Bidder needs to make a summary sheet or if a format will be given.Ans 2 - Please fix or update you BoQ sheet in according to your conveniance, the BoQ summary need to reflect the overall price of each LOT. Q3. Article 25 of the Instruction to Bidder (OPENING OF QUOTATIONS) reads “ Not applicable”. The bidder could not understand this. Bidder observed that as per UN protocol, a representative of the Bidder is called during the tender opening (https://www.un.org/Depts/ptd/tender). This is also the standard norm for international standards to maintain transparency of the tendering procedure. Please confirm that the tender will be opened in the presence of the representative of the Bidders. Q4 - UNOPS is using E-sorucing potral for tendering and will complete the opening, evaluation and award in the same manner, No supplier will be part of the bid opening. Q5 - Note of drawing WW-I-405 -406 and other drawings states that the Contractor needs to provide detailed structural calculations for the thrust block. However, the force main the HDPE line, does not show any thrust block in the drawing. Please confirm that no thrust blocks are required. Ans 5 - Please refer to the drawing WW-I-405 -406 Note . THE CONTRACTOR NEEDS TO VERIFY ALL THE EXISTING NETWORKS LOCATIONS BEFORE CONSTRUCTION. THE CONTRACTOR SHALL SUBMIT A DETAIL STRUCTURAL ALCULATIONS FOR THE REQUIRED THRUST BLOCKS TO SUPPORT ALL TYPES OF BENDS AND FITTINGS. Q6 - No horizontal alignment of the Pipe (distance of Pipe center line from any reference point) is shown in drawings. On the other hand, the horizontal alignment shown in Google Maps shows, in many places the line is routed through the existing buildings and other facilities. Please confirm the horizontal alignment of the ROW corridor for the Project with respect to reference points.Ans 6 - Please refer to the RFQ Technical specifications and drawing . Q7 - Please confirm that if any underground obstacle, other than the ones shown in the drawing, is encountered, it would be considered unforeseen, and any resulting additional work shall be considered as a change order.Ans 7 - Please refer to the RFQ condition and BoQ Technical specification and drawing . WW-I-405 -406 Note . THE CONTRACTOR NEEDS TO VERIFY ALL THE EXISTING NETWORKS LOCATIONS BEFORE CONSTRUCTION. Q8. The alignment of the existing force main is not shown with respect to the new line. The contractor understands that the existing force main is not required to be dismantled/removed, except for the quantity mentioned in BOQ. The contractor also assumes that this existing Force main is beyond the excavation limit of the new pipe trench and therefore, it will not foul with the work under the contract. Ans 8 - Please refer to the RFQ condition and BoQ and technical specification and drawing . Q9 . The drawing pages (WW-I-400 and WW-I-401) for water networks are missing in the drawings of the LOT1.Ans 9 - Please note all drawing have been added or upated accordingly Q10. As you know, the BoQs contain a lot of equipment and materials we need to supply from outside, which takes a long time to get their responses. So, to submit an offer according to the technical specification and drawings, we kindly request that you extend the bid submission deadline by at least two weeks.Ans 10 - Tender has been pusblished over 30 days, no extension at this time will be grantedQ11 No item rate is given in BOQ for the Company office and facilities to be provided by the Contractor in accordance with section 01590 of technical specification. Contractor understands that this cost should be included in the overhead cost for the Contractor and distributed in all item rates. Please confirm. Ans 11 - Supplier has to include any overhead cost required in thier offers. Q12 Please confirm that the land for Contractor's Site office, workshop, storage yard , batching plant etc. shall be provided by Company free of cost . Also , if possible , provide the location of this area . Ans 12 - No free of cost will be provided by UNOPS or its local partners , all charges will be barried by the contractor . This shall form part of the official solicitation documents. Please be guided accordingly
Edited on:
20-May-2023 22:32
Edited by:
webservice@unops.org
New amendment added #2: Admendment No. 2 - to Add the following : - Updating BoQ for all Lots to include minor changes in lump sum qunataties , BoQ updated documents can be located in documents tab
Edited on:
16-May-2023 07:39
Edited by:
webservice@unops.org
New clarification added: Dear Bidder, Please note the below-raised questions and our official responses in connection to the Request for QuotationQ A - You have stated that we can get estimated dimensions from “available unit dimension”. Please note that we could not find any “Unit dimension “in the drawing. Please provide the specific location (Drawing number/note number) where it is available.Ans A - Please note an amendment update the BoQ to include quantity as (1) for all items that Unit is equal to Lump Sum for these type of Works. Q B - Quantities are given in BOQ for work scopes/items which include Plaster, Oil paint, Emulsion paint on the ceiling, epoxy paint, etc. Please confirm that, as the dimensions of rooms are not available in the drawings, Bidder should base their quote on the quantities given in BOQ. Any deviation from these given quantities shall be regarded as a change order. Ans B - Please note an amendment update the BoQ to include quantity as (1) for all items that Unit is equal to Lump Sum for these type of Works. Q C - No work is to be executed by the bidder for the items for which no quantities are given in BOQ. For example, no quantity has been given in Item no. A.6.1.1 (plaster) / Bill no. 6 (Guard Room) / Lot-1. So, Bidder should consider that no plastering work is to be done in this Guardroom. Please confirm. Ans C -Please note an amendment update the BoQ to include quantity as (1) for all items that Unit is equal to Lump Sum for these type of Works. Q2 - Many documents have been repeated in (1) Formal and Eligibility criteria (2) Qualification criteria and (3) Technical Criteria. For example, Schedule 0.4 [Capacity and Experience] and Schedule 0.7 [Performance Statement] is required to be submitted under Qualification Criteria/clause -2 and also under Technical Criteria / Part-1 / clause 1.2. Ans 2 - Please adhere to tendering instructions in tender documentsQ3 - Please confirm that the Bidder can attach this kind of Schedule (which has in asked under multiple sections) under any one of the above clauses and refer to that attachment under other clauses.Ans 3 - Please adhere to tendering instructions in tender documentsThis shall form part of the official solicitation documents. Please be guided accordingly
Edited on:
15-May-2023 23:24
Edited by:
webservice@unops.org
New clarification added: Dear Bidder, Please note the below-raised questions and our official responses in connection to the Request for QuotationQ1: Lot-2 works are supposed to be in Al Tawahi Pump Station. However, the attached drawings for Lot-2 are for Al Ma’alla Pumping station. In fact, the pump house drawings for Lot-2 and Lt-3 are the same. Is it correct? Please clarify.Ans 1 - Please refer to the drawing, all the requested dimensions are mentioned such as Page name . PUMPS ROOM SECTION for the pump house rooms, etc. Q2 : Please confirm that the Bid guarantee issued from Banks in Djibouti will be accepted. If not, please mention which Banks are acceptable.Ans 2 - We recommand issuing the Bid security from Banks in Yemen , all banks in Yemen that are approved by the centeral Bank are accpeted. Q3 : We could not understand your reply dated 8.5.2023 on Q10. We have checked all drawings and specifications. Dimensions of Pump house, facility room, Storeroom, transformer room, Guard room, maintenance area etc. are not available in any of the drawings or specifications? Ans 3 - Please note that the Pump house, facility room, Storeroom, transformer room, Guard room, maintenance area etc are existing facilities and the required Maintenance works are very minor works such as ,Plaster , Oil paint , Emulsion paint on ceiling, epoxy paint , from the available units dimension for each building you can get the estimated dimension , however you are strongly advised to conduct site visits the will give you a full Idea about this very minor works. Q4: Please confirm that the bidder needs to issue a separate Bank guarantee for each of 3 lots @ 2.5% of the quoted value for each lot. Lot1 &Lot2Ans 4 - Yes we confirm , we require BG for each lot. Q6.What is the material for the submersible pump?Ans 6 - Please refer to the technical specification part 2.1 Wastewater Pumps and Technical QuestionnaireQ7.technical specifications for manual screen is not shown in all documents( length, width , depth of bar ,etc)? Ans 7 - Please refer to the drawing sheets titled “ SCREEN CHANNEL SECTION”Q8.technical specifications and dimensions for electrical Screen , not show in all’s documents.Ans 8- Please refer to the drawing sheets titled “ SCREEN CHANNEL SECTION” and ‘’EQUIPMENT SCHEDULES”Q9.material for (body, knife ,seat) for knife gate valve and isolation valve is Not shown .Ans 9- Please refer to the technical specification part SECTION 15206 - GATE VALVESQ10.Facilities for building and guard room , not mentioned the qty for mechanical and electrical work.Q10 - Please note that the maintenance works are very minor limited to the item mentioned in the BoQ such as Lot 2 bill 5 item B and C Q11.Transformer , maintenance ,store, generator rooms is not shown the Qty for electrical work.Ans 11- Please note that the maintenance works are very minor limited to the item mentioned in the BoQ such as Lot 2 bill 5 item B This shall form part of the official solicitation documents. Please be guided accordingly Clarification
Edited on:
11-May-2023 08:36
Edited by:
webservice@unops.org
New amendment added #1: Admendment No. 1 - to Add the following : - Add drawing document referance - Amendment No - 1 - WW0-704 in documents tab- Add drawing document referance - Amendment No - 1 Drawing P-III-A -1 in documents tab
Edited on:
11-May-2023 07:50
Edited by:
webservice@unops.org
New clarification added: Dear Bidder, Please note the below-raised questions and our official responses in connection to the Request for QuotationQ1. As per the tender there is no provision of Advance payment. We request to kindly consider at least 20% advance payment for cash flow.Ans 1 - No advance payment is allowed at any stage. Q2. It is instructed that a bidder is eligible to bid for more than one Lot, however, the evaluation shall be done separately. Bidder has the following questions regarding this:a. Please confirm that, depending on the evaluation, 3 lots could be awarded to different bidders or the same bidders. In other words, there is no limitation for a bidder to get multiple lots if their offers are evaluated to be best in multiple lots.Ans a - Please read the instruction and guidline carefully in the tender, each lot will be evaluatted sepeartly and awarded in the same manner. b. Section -II / Clause 3.5 states that the completion period for this work is 11 months. Please confirm that this is the completion period for each Lot.Ans B - PPlease note that each lot is considered a separate tender and the period of 11 months is the completion period for each lot which is equal to the project completion period of 11 months . c. The qualification criteria stipulate that the Bidder must have executed 2 similar Projects in the past 10 years. Please confirm that the same 2 executed Projects could be shown for Lot-1,2 and 3 qualifications. Ans C - Yes. d. Can the Bidder propose the Common key personnel for 3 lots?Ans D - No Q3.Drawing WW-I-700 states that the detail of the Isolation Valve Chamber is available in Drawing WW-0-704. However, we could not locate this drawing. Kindly provide it or mention the file name if already provided.Ans 3 - Please refer to the BoQ Bill No 3 the note of the item Item No 3.18 . for the drawing WW-0-704. an amendment will be published soon . Q4. Drawing No. WW-I-702, please clarify whether the pipe piece with the puddle flange only is made of DI or if all pipes and fittings inside the valve chamber are made of DI.Ans 4 - Please refer to the Drawing No. WW-I-702 and both options are applicable Q5.Unlike Lot-1 and Lot-3, no piping Plan and profile drawing is given in Lot-2. Please clarify.Ans 5 - for piping Plan and profile drawing for Lot-2. an amendment will be published soon . Q6. Although the Submersible drain Pump and Piping have been included as an item in BOQs of all 3 lots, the drawings do not show these pumps and piping arrangement. Please clarify.Ans 6 - Please refer to the Drawing W X 304 or 303 and the BoQ . Q7. 2 wastewater pumps have been designated as duty pumps and one as stand-by. Please confirm if the stand-by pump is required to engage automatically in case any of the duty pumps fail. If yes, then the stand-by pump should engage in place of pump -1 or pump -2? This is because Pump-1 and pump -2 have different activation levels.Ans 7 - Please note that the stand-by pump should engage in place any of the both pumps -1 or -2 . for the control please refer to the technical specifications . Q8. The BOQ in Lot-2 and Lot-3 shows Pumps having different Capacities and piping. However, the attached mechanical drawings for pump house for Lot-2 and 3 are identical (same drawings). This is why there is discrepancy between drawing and BOQ for Lot-2 (in Pump house pipe fittings diameter and valves). Please clarify.Ans 8 - Please refer to the drawing , BoQ ,technical specifications for each pump . Q9.In BOQ, it is stated that the pumps must be suitable for the existing base. We could not find any detailed drawing for the existing pump base (dimension of foundation, bolt spacing etc. please provide.Ans - 9 Please refer to the drawing , BoQ ,technical specifications for each pump .Q10 - In the given drawings no dimension is given for the pump house rooms and chambers. It is not possible to estimate the extent of civil, mechanical and electrical works without the dimensions, especially the items with LS as unit. Please provide the dimensions . Ans 10 - Please refer to the drawing if all the requested dimensions are mentioned such as Page name . PUMPS ROOM SECTION for the pump house rooms, etc. Q11 - In your file Request for Quotation (RFQ) for Goods/Services you have mentioned you have mentioned the following : Lot 1: supply Standby Power Generator 500 KVALot 2: Supply Standby Power Generator 130 KVALot 3: Suppy Standby Power Generator 750 KVAWhereas in the BoQ it is not mentioned or in your Technical Specification file . Please confim if the Standby Power Generator is consdering as per your file Request for Quotation (RFQ) for Goods/Services or no?Ans 11- For Lot 1: supply Standby Power Generator 500 KVA, Please refer to the BoQ Bill no 10 Item No 10.7For Lot 2: supply Standby Power Generator 130 KVA, Please refer to the BoQ Bill no 8 Item No 8.6Lot 3: Supply Standby Power Generator 750 KVA Please refer to the BoQ Bill no 8 Item No 8.6This shall form part of the official solicitation documents. Please be guided accordingly
Edited on:
08-May-2023 22:32
Edited by:
webservice@unops.org
New clarification added: Dear Bidder, Please note the below-raised questions and our official responses in connection to the Request for Quotation. Dear UNOPS Team ,Q1. As you are well aware, Long holidays of Eid Fitr was taken. So, in order to submit a suitable offer, we would kindly request you to extend bid submission deadline date at least for two weeks .Ans 1 - No extension is granted in case any extension you will be notifed through system. Q2. No quantities mentioned for some works items & comes by Lump Sum, Please clarify if you can arrange the site visits, if yes please inform place, Focal points & date.? Ans 2 - Please cooridnate with our partners PMU Office - Urban Water Supply & Sanitation Project for any requirements and site visits, note site visits is optional. Thank You & Best Regards
Edited on:
30-Apr-2023 21:29
Edited by:
webservice@unops.org